PROJECT DESCRIPTION
This project is mainly to solve the domestic water problem of the project department of the Guangxi Branch of China Aluminum Corporation Limited, mainly to turn the turbid reservoir water into usable domestic water. Since the local reservoir water is used as the water source, the water volume is sufficient, contains sediment, organic matter, etc., and there are a small amount of pathogens in the water quality, Kangjin Water Treatment uses ultrafiltration technology for your company and provides a set of 4 tons/hour ultrafiltration equipment to meet customer needs.
Water quality requirements: The purified water meets the sanitary standards for drinking water (GB5749-2006).
PROJECT INFORMATION
Project name: Baise Pingguo Aluminum 4 tons/hour mobile ultrafiltration equipment
Installation date: 2023-5-13
Project duration: 5 days
Project location: Baise Pingguo
PROCESS FLOW CHART
INSTALLATION PROCESS
The equipment was loaded and transported from the Nanning warehouse to the project site. When we arrived at the site, we first positioned the equipment to be installed, and then connected the wiring. After the connection, we filled the sand and carbon, and finally connected the power supply for debugging.
1. The equipment was loaded and sent from the company to the destination Pingguo
2. Equipment arrives at the construction site
3. Install and debug equipment